Wednesday 20 July 2011

29-31 days of internship

18th - 21th July 2011

I was ask to design a brochure. so it took me like a few days to complete the overall brochure design. There was also a reference for me to follow, the reference was given by the boss. It is not my final design brochure since the boss said i still have to do some little modification to it, but i haven't start the modification yet, since the boss said he'll discuss about it later. In between those days, i also have to update the B2B website and check if there is any enquiry from any customers. Well, on the 16th and 17th of july, which is saturday and sunday. Boss can't stop calling me and ask me to duplicate the receipt that he wanted to used immediately. It was kind of though because we were discussing about what he wants through the phone. He started asking me to do it, on the saturday night, so i end up finishing what he wants on sunday evening. Well that is an experience! Below are some example of my brochure design and the duplication of the receipt that is put into words file:

Brochure:
 

Bill:

26-28 days of internship

12th - 15th of July 2011

I was given a new task again, that was to re-design the existing business card. So i do the things that i usually do before putting all the design in the computer. So i ended up with 4 different design of business card. Also in between those day, i had to do some little modification on the letterhead and put it as a watermark in words so that it would be easier for my boss to write information on it. Below are the final letterhead and some few example of business card:

Letterhead:
Business card:
 


Final Business card:

19-25 days of internship

1st July - 11th July 2011

On the 1st of july, i started doing the B2B website by putting all the information about the coal products. It was not that easy cause some of the website is quite complicated, such as i have to put the correct information, the right amount of description or else it can't be upload. So it took me like the whole day to not really complete all the B2B website. Well on the 4th-6th of july, was still doing the B2B website by doing some small modification and so forth, then unfortunately i had to re-modify the previous catalog that i thought was done! So in between those two days, I have to change the table color and the font types and so forth. Then on the 7th - 11th of july, i was given a new task, that is to create a letterhead, well i had to do some research and sketches before i proceed to design it on the computer. It took me 4 days to complete all of the 5 design letterhead, and in the end my boss chose the very simplest letterhead. It was kind of a break down, but yeah i have to follow what he wants. Below are  few example of the re-modified catalog and letterhead:

Catalog:
 

Letterhead:
 

18th day of internship

30th June 2011

Ok, it has been a long time, being really busy with works and also going here and there with my family and friends. :) Back to the work part, I was given a briefing again about a B2B website, that is Business to Business website. What i was brief on is, how to input the product, product name and so forth. There was 4 different types of B2B website that i was introduce by Mr James. Well that was it for today. Below are list of the website:

a) http://www.made-in-china.com/
b) http://www.ec21.com/
c) http://www.tradekey.com
d) http://www.ecplaza.net/